guzzi
New Member
Posts: 6
|
Post by guzzi on Nov 9, 2011 2:17:13 GMT -5
Just about to order ribs from Linda and Steve , got the question Left, Right , Left and Right ......So plans say Left..old site has evaporated (which happened to be my sonerai bible)and I know this question has been asked and answered several times , but those of you out there who know can you please help..... thanks
|
|
|
Post by soneraifred on Nov 9, 2011 10:54:35 GMT -5
Which set of plans are you working from? If you are building a II, IIL, or IILT, the the plans show the "B" wing. The "B" wing has LH and RH wing panels that are mirror images of each other, so you'd need 11 RH (rib flanges point to the right) and 11 LH (rib flanges point to the left) ribs. If you are building a IILS or IILTS, the plans show the "S" wing. The "S" wing panels are not mirror images of each other, and use all LH ribs (the rib flanges point to the left). So, you'd need 22 LH ribs.
|
|
guzzi
New Member
Posts: 6
|
Post by guzzi on Nov 9, 2011 15:42:57 GMT -5
Thanks Fred for clarifying that, yes I am building a stretch with the "s" wing, so all left is the go. Will order with confidence now!
|
|
peterzabriskie
Junior Member
"Did I make that part the best I possibly could have?" Unknown
Posts: 99
|
Post by peterzabriskie on Nov 17, 2011 8:51:29 GMT -5
|
|